Can I use a piece of schedule 40 conduit, a pair of male threaded adapters, and a pair of locknuts to connect a meter pan and a 3R loadcenter mounted side by side about 7 inches apart? The conduit KO would be well below the buss bars. For what it's worth, the poco used sch40 to bring the power up to their meter pan (they provide and install the pan).