Just a general question. What are some options other than dimensional lumber for deck joists? My span is going to be 15.5' from edge of one beam to the other. Using standard PT lumber is going to be a nightmare at those lengths due to the inability to get straight lumber anymore.

I looked at Trex Elevations but wow, I'd be spending $6k+ just on joists. I-Joist or LVL's would work but they aren't weather rated. Or is there a way to still use those? Any other options?
 

· JUSTA MEMBER
Joined
·
20,339 Posts
May I suggest that you go to a REAL lumber yard, and hand pick all your material.

Most of them allow you to do this, if you want to.

I have had the yard crew help me picking my materials.

And if you discover any that are "rejects" after delivery, you can return them for replacements.


ED
 

· Registered
Joined
·
73 Posts
Discussion Starter · #5 ·
May I suggest that you go to a REAL lumber yard, and hand pick all your material.

Most of them allow you to do this, if you want to.

I have had the yard crew help me picking my materials.

And if you discover any that are "rejects" after delivery, you can return them for replacements.


ED
Yeah we have some good ones here in MN but still, how straight can you get a 2x12x20 in PT even top grade? Or do I put a mid-beam and split it with 2x10x12 on each side?
 

· Naildriver
Joined
·
24,830 Posts
You could use 2x10 lumber if you were to drop your support back to 13' and cantilever 2' over the edge. Just post and beam the length at the 13' mark.
 

· Registered
Joined
·
73 Posts
Discussion Starter · #8 ·
Why do you need 20' lumber?

You say the span is 15.5'.

That wastes 4', that you won't use.


ED
So the deck will be 42'x20'. But there is a block wall 3' out from the house that will support the house end of the deck. They will sit directly on top of that. Then span out 17' to make it 20' total distance.
 

· Naildriver
Joined
·
24,830 Posts
You could get by with 2x10x10's if you made your mid span beam flush with the bands, and attach the 2x10's to the beam using joist hangers. May be easier to find straight 10 footers than 20 footers.
 

· Naildriver
Joined
·
24,830 Posts
Another reason for splitting the load would be, while you can span 15 or more feet with 1x10 or 2x12 lumber, you will still have a bounce factor, which you will eliminate with the mid span beam.
 