Hi All,
I'm putting a bathroom in the basement and I need to dig a new floor drain for the bathtub and toilet. Unfortunately, the floor is pretty uneven. So, the question is, should I level the floor first and then cut out the floor drain, or cut out the floor drain first and then level the floor?
Thanks!