Did you leave out "new YOUNG engineer"I spent 3 hours explaining that bridge to a new engineer one day. He made 4 phone calls before he passed it and let us pour concrete. We lost a day over that.
Did you leave out "new YOUNG engineer"I spent 3 hours explaining that bridge to a new engineer one day. He made 4 phone calls before he passed it and let us pour concrete. We lost a day over that.
He wasn't young but new to us. I explained to him the whole site had been compacted but the slope was not, he could not get his head around that. At one point he agreed with everything I said but still wanted to check with others.Did you leave out "new YOUNG engineer"