I am aware that the only time that you bond the neutral to the ground is when it is in an entrance panal. Well I have a dilemma. The city that I reside requires me to install a new meter base which includes an outside breaker for the fire dept to be able to shut off the house if needed. Now since there is a breaker beyond the entrance panel, does this mean that the entrane panel is now treated as a sub panel and should have the neutral and ground isolated from one another? Then do the bonding in the meter base?
Thanks in advance :thumbsup:
Thanks in advance :thumbsup: