Just call me Andrew
Joined
·
2,279 Posts
Discussion Starter · #1 ·
Hi,

We're redoing a small bathroom (3' x 6') and in a bit of a time crunch.
We'll start grouting at 3:00pm today, and then we'll need to start immediately working on other jobs in the space. (We need to grout to allow full dry time prior to installing vanity/toilet).

We're using Bostik Premixed grout, which has a dry time of 24-48 hours.

Ideas? We're thinking of laying 5/8 plywood over the tile to allow us to walk without disturbing the grout. Is this ok?

Thanks.
 

·
Registered
Joined
·
2,440 Posts
You would be better off to just allow the time for the grout to set up. What is so critical time wise that you can't wait? If you are going to go through the trouble of all the work, do it right the first time, don't rush it for the sake of finishing at a certain time.
Mike Hawkins:smile:
 

·
Premium Member
Joined
·
7,940 Posts
Gotta agree with firehawkph on this one. To add, why are you doing the grout NOW if there are other things needing done in the space. Any tile work that I have done, well, I have waited to do the grout last.
 