Joined
·
650 Posts
Hello. Me and my fiance recently purchased our first home and are busy doing some remodeling to it before we move in. The list of to-do's is steadily growing, but i think it has finally come to an end. Can some of you seasoned remodelers please look at this list and tell me what can be done while occupying the home? We need to move in as soon as possible. Thank you for any opinions.
- 14G wire
- Receptacles
- Switches
- Insulation
- Drywall
- Drywall Compound
- Drywall Tape
- Drywall Corners
- Paint
- Baseboard Trim
- Ceiling Trim
- One Interior door, pre-hung
- Ellerton Laminate Flooring
- Flooring Underlayment
- Base Cabinets, cabinet paint, polyurethane
- Laminate Countertops
- 20 ten-foot CPVC pipes
- 5 CPVC Tees
- 5 CPVC Elbows
- 5 Water Shutoff Valves
- 1 Entry Door
- 1 closet system for master suite
- new bathtub
- new vanity
- new bathroom faucet
- tub faucet
- wax ring
- hot water heater
- Vinyl siding
- House wrap paper and tape
these are the items we still need to buy and install, we already have everything else we need. Can anyone offer any help as to what can wait and what is necessary to legally inhabit this home?
- 14G wire
- Receptacles
- Switches
- Insulation
- Drywall
- Drywall Compound
- Drywall Tape
- Drywall Corners
- Paint
- Baseboard Trim
- Ceiling Trim
- One Interior door, pre-hung
- Ellerton Laminate Flooring
- Flooring Underlayment
- Base Cabinets, cabinet paint, polyurethane
- Laminate Countertops
- 20 ten-foot CPVC pipes
- 5 CPVC Tees
- 5 CPVC Elbows
- 5 Water Shutoff Valves
- 1 Entry Door
- 1 closet system for master suite
- new bathtub
- new vanity
- new bathroom faucet
- tub faucet
- wax ring
- hot water heater
- Vinyl siding
- House wrap paper and tape
these are the items we still need to buy and install, we already have everything else we need. Can anyone offer any help as to what can wait and what is necessary to legally inhabit this home?