Joined
·
158 Posts
Just wanted to post some pictures so I can share with everyone, and forward people to this site to get some updates on where I am currently with this project. This site is a great site for sharing, and learning... Has helpmed me numerous times already.
This is a three year project not because of the difficulty, because I am doing it myself, available hours come into effect, and available monthly budget comes into effect, but we'll get there one day! :thumbsup:
The basement is roughly 1300sq ft, and the mecanical room takes about 300sq ft, and is already finished in 5/8 plywood on all walls.
The three piece bathroom(shower, toilet, sink) is approx. 90sq ft, with some space lost to stairs/closets.
So, I am looking at roughly 850sq ft basement with one bedrom, one freezer/storage room, the rest being a family room/game room, which includes a small bar area.
Start date: January 2008
presently june 2009: drywall 2nd coat
anticipated finish date, january 2010 :thumbup:
Thanks for stoping by...
This is a three year project not because of the difficulty, because I am doing it myself, available hours come into effect, and available monthly budget comes into effect, but we'll get there one day! :thumbsup:
The basement is roughly 1300sq ft, and the mecanical room takes about 300sq ft, and is already finished in 5/8 plywood on all walls.
The three piece bathroom(shower, toilet, sink) is approx. 90sq ft, with some space lost to stairs/closets.
So, I am looking at roughly 850sq ft basement with one bedrom, one freezer/storage room, the rest being a family room/game room, which includes a small bar area.
Start date: January 2008
presently june 2009: drywall 2nd coat
anticipated finish date, january 2010 :thumbup:
Thanks for stoping by...