I'm doing to do a monolithic pour on my garage addition and will need about 13 yards of concrete which will require two loads. Can I have my first truck deliver 3000 psi which will fill the footing and lower wall areas and then have my second truck deliver 4000 psi for the slab? The second pour would be put on top of the first pour right away (one truck would be right behind the other).