Joined
·
2,165 Posts
In looking at the enclosed directions for the transfer valve, it indicates that when installing above the Posi Temp Valve, there is a 9/16th offset.
Appears the transfer valve is setback 9/16.
Two questions:
1. ) Why? When I look at the 2 dry assembled (with a straight piece of copper) they appear directly over each other, looking at the black plaster assembly guide?
2.) How do I accomplish this offset?
Thanks,
Ed
Appears the transfer valve is setback 9/16.
Two questions:
1. ) Why? When I look at the 2 dry assembled (with a straight piece of copper) they appear directly over each other, looking at the black plaster assembly guide?
2.) How do I accomplish this offset?
Thanks,
Ed