Hi,
I am doing some renovations and would like to modify two supporting walls. I will attach the pics for both. In one (the longer one) there currently is three 2x10s over a 10' span. I would like to remove the 2x6s in between to make a large doorway and was debating wether changing the three 2x10s for two or three 9.5" LVL. Would that be sufficient or impossible to determine?
Second is a doorway i would like to extend from 32" to 60" span (to where the green drywall is cut). Would two or three 2x10s be sufficient or better go with LVL? Also right now it's on a 2x4 stud for support ...should I put that on two 2x4s? The more the better I guess, but would reduce my doorway.
Please send me your feedback ASAP and send me any questions you need answered in order to give an educated reply.
Thanks!
I am doing some renovations and would like to modify two supporting walls. I will attach the pics for both. In one (the longer one) there currently is three 2x10s over a 10' span. I would like to remove the 2x6s in between to make a large doorway and was debating wether changing the three 2x10s for two or three 9.5" LVL. Would that be sufficient or impossible to determine?
Second is a doorway i would like to extend from 32" to 60" span (to where the green drywall is cut). Would two or three 2x10s be sufficient or better go with LVL? Also right now it's on a 2x4 stud for support ...should I put that on two 2x4s? The more the better I guess, but would reduce my doorway.
Please send me your feedback ASAP and send me any questions you need answered in order to give an educated reply.
Thanks!