Try the,"Contractor Talk" at the top of the page.If I want to change of contract scheme from BOQ (Unit Cost) contract to Lump sum contract, how do I estimate of quantity allowance?
Thanks, Ron.Try the,"Contractor Talk" at the top of the page.
Ron