Hi All,
I have been "lurking" in on this site for a long time and I ussally find the answers I need without having to ask but here goes.
The Scene
I have a three story old house with a Cast Iron Stack.
- first floor toilet and sink go directly into the stack (no vent). The toliet is three feet of pipe from the stack.
- Second floor is the same thing straight to the stack (about 3 feet) no venting. At least that I can find without ripping the entire wall out.... I am assuming that the waste flows right past the downstairs bathromm drain opening etc..
The Challange
I would like to put a bathroom on the third floor. Again the toliet will be about three feet from the stack.
My questions are as follows.
1. Can I do this? (is it called wet venting?) What if the second bathroom group does have a vent into the same stack?
2. Do I need to vent it anyway?
3. Do I just cut the cast iron and insert an ABS wye or what??? I could use a fernco flex one but I am afraid of the weight of the 8 feet of CI about the tee.
4. What else am I missing here? problems, issues that I may have not though about?
Now I know that I may get the odd "you need to get a professional" comment but this is a DIY chat and we are all here for that reason. Lets face it, it's a pride thing to say "yeah I did it and it only cost 100 dollars more than if I hired a pro...":thumbup:
I would like to win this fight cause my wife thinks I am going to lose!
Thanks for any input and I look forward to some replys!
GC
I have been "lurking" in on this site for a long time and I ussally find the answers I need without having to ask but here goes.
The Scene
I have a three story old house with a Cast Iron Stack.
- first floor toilet and sink go directly into the stack (no vent). The toliet is three feet of pipe from the stack.
- Second floor is the same thing straight to the stack (about 3 feet) no venting. At least that I can find without ripping the entire wall out.... I am assuming that the waste flows right past the downstairs bathromm drain opening etc..
The Challange
I would like to put a bathroom on the third floor. Again the toliet will be about three feet from the stack.
My questions are as follows.
1. Can I do this? (is it called wet venting?) What if the second bathroom group does have a vent into the same stack?
2. Do I need to vent it anyway?
3. Do I just cut the cast iron and insert an ABS wye or what??? I could use a fernco flex one but I am afraid of the weight of the 8 feet of CI about the tee.
4. What else am I missing here? problems, issues that I may have not though about?
Now I know that I may get the odd "you need to get a professional" comment but this is a DIY chat and we are all here for that reason. Lets face it, it's a pride thing to say "yeah I did it and it only cost 100 dollars more than if I hired a pro...":thumbup:
I would like to win this fight cause my wife thinks I am going to lose!
Thanks for any input and I look forward to some replys!
GC