Presumably passed inspection, as I'm really not entirely sure when was done prior to our ownership. Things down here were rarely permitted back in the day and I heard this area was called a "green county" where all contractors did was grease the inspectors and everything passed. :wink2:
That said, can't post a photo now as I demoed that area, and will need to reconnect in one of two ways, as mentioned above. Crux of question is will crap flow down hill better at a 45 ish angle or drop vertically before direction change. This is akin to a short second floor tie in of stack to main waste line below, just not as much vertical drop.
Thanks
That said, can't post a photo now as I demoed that area, and will need to reconnect in one of two ways, as mentioned above. Crux of question is will crap flow down hill better at a 45 ish angle or drop vertically before direction change. This is akin to a short second floor tie in of stack to main waste line below, just not as much vertical drop.
Thanks