If all was well With the proper flashing/lead/cricket how would you as a professional roofer go about shingling this A/C unit (Cutting the main roof)
in Detail Which Shingles would you put on in Order
which position would the shingle be placed to meet its proper spot with the flashing
were talking about at the Top corner of this A/C unit to meet into the cricket to create your Weave then to continue up the Cricket cutting the main in the end. You would have your first piece of step flashing on top the lead at the bottom of the cricket
in Detail Which Shingles would you put on in Order
which position would the shingle be placed to meet its proper spot with the flashing
were talking about at the Top corner of this A/C unit to meet into the cricket to create your Weave then to continue up the Cricket cutting the main in the end. You would have your first piece of step flashing on top the lead at the bottom of the cricket