In my back yard I have an area of concrete that looks like it was half way poured, then the previous owner went back a few years later and poured the rest of it with left over concrete, so it's uneven and in sections. If I boarded off the area and laid concrete on top of this, would it set well? I just want it to look better and be more functional instead of lop-sided and uneven.