DIY Home Improvement Forum banner
1 - 9 of 9 Posts

· retired framer
Joined
·
72,441 Posts
Just build a 2x6 frame and nail it to the wall so the finished height will be 7" below the floor. Drive treated stakes inside the front to nail to add flashing like a ledger and add decking.
 

Attachments

· Registered
Joined
·
326 Posts
Discussion Starter · #6 ·
How deep would you make this step?

I had envisioned it being a larger steps up but the way you’ve drawn it, a natural step would be 12 ish deep?

For the stakes, are you talking about 2x2 PT stakes?
 

· retired framer
Joined
·
72,441 Posts
How deep would you make this step?

I had envisioned it being a larger steps up but the way you’ve drawn it, a natural step would be 12 ish deep?

For the stakes, are you talking about 2x2 PT stakes?
a step is around 12 inches and a landing is 36" but who's looking.

When you drive stakes deep they tend to splinter, I would start with 2x4s
 
1 - 9 of 9 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top