I'm going to be installing laminate which will require a nosing at the top of the basement stairs. I have the laminate but the nosing is on order (2 weeks for delivery of the nosing). The stair is opposite the longest wall in the room. Can I start at the longest wall, work towards the stair and then install the nosing once it is delivered or is this asking for trouble?
Thanks
Thanks