DIY Home Improvement Forum banner
1 - 4 of 4 Posts

· Registered
Joined
·
2 Posts
Discussion Starter · #1 ·
We are having our powder room floor tiled in a few days, and today the plumber came and swapped out the lead waste pipe for pvc. He left it high so we could tile and then he will come back to cut to appropriate height.

We noticed there is a lot of cold draft coming up through the large gap around the pipe and wondered if we could put insulation there, stuffed down under the subfloor and trying to block the air before the backerboard and tile is installed. Is this appropriate and if so, what should we use?

I've attached a photo to better illustrate -- Thanks for any suggestions.

j
 

Attachments

· Banned
Joined
·
30,077 Posts
I am guessing you are over a crawl space vs. a basement?

When the flange goes on, it should be tight to the floor and sealed to the subfloor.

If you want to seal it in the meantime, stuff a plastic bag around it or some batt insulation if you have some around. The trash bag option is usually much more readily available.
 

· Registered
Joined
·
2 Posts
Discussion Starter · #3 ·
Plastic bags are a lifesaver

Thanks for writing! We actually have used plastic bags stuffed around the pipe as we work in that room, and yep, they work wonders.

I understand that flange should be installed thru the new tile/backerboard, but since it was not previously (the existing vinyl was installed just up to the flange decades ago, it looks like) I am concerned that will be the case again this time for some unknown reason. If this is what has to happen, is it okay to just leave the plastic bags in there over time, do you think? I am guessing/hoping there wouldn't be a mold issue with the plastic? Happy to get some batt to do the same thing if you think that is a better solution.
 

· Banned
Joined
·
30,077 Posts
Is that space over a crawl space?

The bigger issue is that there is no insulation or air barrier down there if so.

Look up all the crawl space threads here on this forum and you will get some ideas on how to improve that insulation schedule. That has to be fixed up a well or you are going to have an ice cold bathroom/toilet.
http://www.youtube.com/watch?v=07h2O496kyU
 
1 - 4 of 4 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top