We want to run a temporary electrical drop onto some vacant land, which is no problem with the PoCo. They want a 20' long 6x6 post buried 5' below ground though. With post-hole-diggers I can get near 4' but what do I do to get deeper? We only need one pole so I'd rather not go rent equipment for one stupid hole but can't think of another way.
Thanks!
Thanks!