I need to get from point A to point B in the unfinished basement of my house with 3 new runs. From A to B is about 22 perpendicular joists, so I think i have two options.
drill 3 sets of holes through 22 joists, or, it appears a prior electrician (or homeowner) used the side of the sill plate as a raceway for a single circuit...could I use a stacker of some sort to get 3 more runs tucked away in there? I guess a) is that legal code-wise and b) what sort of stacker would I use?
here is the space I am talking about...
drill 3 sets of holes through 22 joists, or, it appears a prior electrician (or homeowner) used the side of the sill plate as a raceway for a single circuit...could I use a stacker of some sort to get 3 more runs tucked away in there? I guess a) is that legal code-wise and b) what sort of stacker would I use?
here is the space I am talking about...