Concrete block wall. Trying to repoint before i frame and finish my basement. I got a dust shroud shop vac attachment for my makita angle grinder, Starting on a section of wall that is 11ft. wide x 80in. height. Can i just go ahead and rake 1/2in. of the mortar out of the whole wall at once, or is it best to do in sections?
 

·
Registered
Joined
·
354 Posts
If you’re only going to half inch deep you can do the whole wall at one time even with a vac you’re going to have dust so make sure you close seal off the vents and stairway and open basement windows if you have them


Sent from my iPhone using Tapatalk
 

·
Registered
Joined
·
19 Posts
Discussion Starter · #4 ·
If you’re only going to half inch deep you can do the whole wall at one time even with a vac you’re going to have dust so make sure you close seal off the vents and stairway and open basement windows if you have them


Sent from my iPhone using Tapatalk
Be prepared for a heck of a dust cloud.
Thanks, good to know i can just do the whole thing at once and, yeah I'm prepared for the dust lol. Got my ppe, everything sealed off and rented a HEPA air scrubber
 