Hi all,
I'm doing some work for a rather difficult client and am requesting some help.
She purchased cheap stick on tiles for about 10 dollars a pack and wanted to stick those directly on her rotting floorboards.. I told her this would not really work since the floor is not flush and the existing boards are rotting and not safe to hold a load, not to mention they'd be getting wet.
So she agreed to put down a new subfloor or lay one on top of the existing boards. Unfortunately she went ahead and had the plywood delivered herself. It is only 5/8" plywood no tongue and groove. The joists are 16" apart but the issue here is the thickness of the plywood..is that thick enough? I thought 3/4" was the minimum. Also, there are baseboard heaters in the bathroom, I'm assuming these would need to be moved up to accommodate for the increased floor height. How to go about that exactly?
I'm almost ready to give up here, she hired me to sweep up her cellar and finagled me into remodeling her bathroom somehow, however she wants everything done for close to nothing and with bathrooms, that's just not a feasible thing. She isn't going to take the plywood back as it had to be delivered. What do you guys recommend I do here with this floor? Thanks!
I'm doing some work for a rather difficult client and am requesting some help.
She purchased cheap stick on tiles for about 10 dollars a pack and wanted to stick those directly on her rotting floorboards.. I told her this would not really work since the floor is not flush and the existing boards are rotting and not safe to hold a load, not to mention they'd be getting wet.
So she agreed to put down a new subfloor or lay one on top of the existing boards. Unfortunately she went ahead and had the plywood delivered herself. It is only 5/8" plywood no tongue and groove. The joists are 16" apart but the issue here is the thickness of the plywood..is that thick enough? I thought 3/4" was the minimum. Also, there are baseboard heaters in the bathroom, I'm assuming these would need to be moved up to accommodate for the increased floor height. How to go about that exactly?
I'm almost ready to give up here, she hired me to sweep up her cellar and finagled me into remodeling her bathroom somehow, however she wants everything done for close to nothing and with bathrooms, that's just not a feasible thing. She isn't going to take the plywood back as it had to be delivered. What do you guys recommend I do here with this floor? Thanks!