I am finishing my basement. In so doing in am installing interior weeping tile. (would do exterior but because of landscaping, neighbours, etc. can't)
Need to get the concrete I jack-hammered and dirt out. about a cubic yard of concrete (only doing half so another later) and a cubic yard of dirt (same more later).
Can't rent conveyor here.
Looking at a couple of ideas.
1. build rails with 2x6's then have a wheeled cart and pullies, with a winch. Kinda like in the mines. This would dump rightinto the trailer.
2. build a trough (need one to get gravel in basement anyway.). elevate it inside basement so it is level or slightly up. Then use tubs (I have 8) and rope to slide them out. Would have to go up short stepladder to get tubs into through.
Any other ideas or thoughts?
Thanks for any help.
Need to get the concrete I jack-hammered and dirt out. about a cubic yard of concrete (only doing half so another later) and a cubic yard of dirt (same more later).
Can't rent conveyor here.
Looking at a couple of ideas.
1. build rails with 2x6's then have a wheeled cart and pullies, with a winch. Kinda like in the mines. This would dump rightinto the trailer.
2. build a trough (need one to get gravel in basement anyway.). elevate it inside basement so it is level or slightly up. Then use tubs (I have 8) and rope to slide them out. Would have to go up short stepladder to get tubs into through.
Any other ideas or thoughts?
Thanks for any help.