I'm installing a generator 6 circut manual transfer switch. Looks like I need to either splice the circuts in the load center (circut breaker box) and bring the wires out to the transfer switch, or I can pull the wires out of the load center and add junction boxes and then route the circuts to the new generator transfer switch.
I have the room in the load center. I'd prefer this method. Is it up to code?