Joined
·
1 Posts
I am installing an automatic transfer switch for a generator in Hudson, NH.What are the code rules for running the flexible conduit from the transfer switch to the generaotr tie in point? I plan tio run the conduit across the floor joists in the basement. Are there areas I need to avoid or can't run the conduit near (such as propane black pipe lines)?