Google "stem wall construction"
Always best to build anything at least 6" above grade so the siding and sheathing is not going to rot out from splash back and have water getting in under the walls.
Always best to build anything at least 6" above grade so the siding and sheathing is not going to rot out from splash back and have water getting in under the walls.