I'm starting to frame the walls of my basement, but before begin, I have a couple of questions. If you see the black pipe (Gas Pipe) It this pipe in the right place or the wrong place? because , how I should be do to frame the ceiling? I should move this pipe? Where?
The second question is about the insulation in the wall I have 50% insulated and the other 50% concrete. I have to remove the all insulation and re-insulate again the whole wall? or insulated only the bottom part? and after that start the framing?
Thanks for your time :thumbup:


The second question is about the insulation in the wall I have 50% insulated and the other 50% concrete. I have to remove the all insulation and re-insulate again the whole wall? or insulated only the bottom part? and after that start the framing?

Thanks for your time :thumbup: