The end I thought would never come has arrived :thumbsup:. The drywall is all finished. My assessment is if you were shooting for a level 4 finish and were judging on a 1 to 10 scale, I put mine at about 8 to 8.25. I can see seams on the ceiling (smooth finish) if I remove the curtian on the basement window and stand at the opposite end of the room. But if the lighting is from the overhead lights only, I can't see them. I only have the ceiling painted so far, so the jury is still out I guess. However, I don't think the walls would show as much as the ceiling since you can't get the same lighting on them as I did on the ceiling.
I wanted to thank all the folks here for their help.
I still have quite a bit more work to do before this project would be considered done. Doors, trim, tile in the bath etc., but it's coming along.