I'm getting ready for a final electrical inspection. I am putting in potlights but will not have the drywall done by inspection time. Must I install bulb holders for example in place of each potlight or would the inspector be satisfied with having them left open?
Also I have one junction box that I added an extension to increase the capacity. I have 7 cables( #14 wire) in the box. Is that too many. There appears to be lots of room for them all. Thanks for your help.
Ps I live in Ontario Canada.