I bought 1/2" thick 3 1/2 wide with random length Brazilian engineered and hired a contractor to install by glue over concrete. I thought he was going to float the floor but he didnt do it. Instead he said he would use more glue. After it was done, the next day I noticed there are numerous hollow sounds....this means that the glue is not in contact with the wood in this area (10 different locations in a 300 sf room)......the job looks fine but I am concerned with a few months down the road........Is there anything he can do to repair this? This problem could have been easily prevented if he had floated the floor....so I am kind of upset.
Thank you in advance for your response.
Thank you in advance for your response.