You cant.
Either add a new beam and posts (and then verify that the existing beam and piers can handle the additional load), replace joists with longer joists and new beams/piers/posts, IF the piers are sufficient for the new load you could remove the beam and replace with a dropped beam and new joists cantilevered over the beam.