I pulled an electrical permit for the gut and renovation of my kitchen. I have all the boxes placed and will begin pulling wires tomorrow. The inspector told me he wanted to come out when I was "ready to insulate". Since the actual receptacles and switches are installed after the drywall, those devices don't need to be present at the first inspection, right?