I am at work so no picture for now. The bathroom is 7' wide and the tub is 5' wide. The alcove comes out 4" beyond the tub and then goes one foot to the outer walls on each side.
Oh, that's what I was thinking I was going to do, drywall the 4" beyond the tub and use a corner bead on the corner. If we use 6" tile (not sure yet) then 2" would be on the durock and 4" on the tile. I have not researched yet, but can you put Redguard on the drywall that will be under the tile or is it strictly for cement board?
Out of plumb? As in what sense? What do I need to make sure is plumb to what?
Thank for the input guys.
B
Oh, that's what I was thinking I was going to do, drywall the 4" beyond the tub and use a corner bead on the corner. If we use 6" tile (not sure yet) then 2" would be on the durock and 4" on the tile. I have not researched yet, but can you put Redguard on the drywall that will be under the tile or is it strictly for cement board?
Out of plumb? As in what sense? What do I need to make sure is plumb to what?
Thank for the input guys.