I am starting to hang the drywall and my building department requires a screw inspection before I tape. What exactly are they going to be looking for? I am going off of what I read somewhere that you should use 7 inch spacing between fasteners on the edges and 12 on the studs in the middle, does that sound right?
So for the area in this picture (the edge of the ceiling), am I supposed to put wood where I put this red line so that I can meet the 7" requirement (I already passed the frame inspection and they didn't say anything about it) or can I just fasten the drywall edge to the spots where I have the red x's?
So for the area in this picture (the edge of the ceiling), am I supposed to put wood where I put this red line so that I can meet the 7" requirement (I already passed the frame inspection and they didn't say anything about it) or can I just fasten the drywall edge to the spots where I have the red x's?