We're in the process of having a house built. The house is framed with 14" engineered joists, mostly 16 and 19.2 OC. with 3/4" osb t&g subfloor.
Of course, if tile is put down, additional underlayment will be used.
We've been told (not by the builder) that adding another layer of 3/4" subfloor (staggering the seams) throughout the home will make for a rock solid floor.
The builder says they will do it, but it is expensive (> $10K). They also said that using their standard system, along with screwing and gluing, they have very few complaints or callbacks.
Does anyone have an opinion as to if this is worth it? Or, is it totally overkill and a waste?
Thanks!
We're in the process of having a house built. The house is framed with 14" engineered joists, mostly 16 and 19.2 OC. with 3/4" osb t&g subfloor.
Of course, if tile is put down, additional underlayment will be used.
We've been told (not by the builder) that adding another layer of 3/4" subfloor (staggering the seams) throughout the home will make for a rock solid floor.
The builder says they will do it, but it is expensive (> $10K). They also said that using their standard system, along with screwing and gluing, they have very few complaints or callbacks.
Does anyone have an opinion as to if this is worth it? Or, is it totally overkill and a waste?
Thanks!