I would temporarily support the beam, then take out the old posts. Cut the old flush with the slab, drill or remove the wood. Drill new post anchors into the piers, fastening with epoxy and wedge anchors. Attach new posts, with post caps from Simpson.
http://www.strongtie.com/products/categories/post_bases.html
http://www.strongtie.com/products/categories/post_caps.html
These will elevate the posts to keep water away.
Also add bolts to bring the ledger/house attachment up to code, as per local Building Department.
Be safe, G
http://www.strongtie.com/products/categories/post_bases.html
http://www.strongtie.com/products/categories/post_caps.html
These will elevate the posts to keep water away.
Also add bolts to bring the ledger/house attachment up to code, as per local Building Department.
Be safe, G