Joined
·
1 Posts
I am planning on building a deck on a hill, the frost line is 42" and city requirements is 48". Do I need to dig even deeper since there will be two different levels of posts on this hill? The grade difference is about 3 feet from one post to the lower post and they won't be more than 6 feet apart.
Thanks
Thanks