The minimum footing depth in my area is 12".
I dug a 24" footing and put in 2" of gravel and 10" of concrete. The post will sit on top of the concrete footing, and the hole back filled with dirt.
Is frost heave a risk if the POST is not below frost line, or only if the concrete footer under the post is not below the frost line.
I would think it is a risk since the post is just sitting on top of the concrete footer and could be heaved up, but maybe not.
Please advise!
I dug a 24" footing and put in 2" of gravel and 10" of concrete. The post will sit on top of the concrete footing, and the hole back filled with dirt.
Is frost heave a risk if the POST is not below frost line, or only if the concrete footer under the post is not below the frost line.
I would think it is a risk since the post is just sitting on top of the concrete footer and could be heaved up, but maybe not.
Please advise!