Auger the 12" holes and put in the Sonotubes (5 or 6 or whatever). Set them vertical and get the inspection and go on.
When they are done, order a small load of concrete and use any excess where you want (sidewalk, etc.) or force the supplier to take it back and get rid of it.
Bags can cost far more than ready-mix in the end if you consider everything like time to pick up labor, cleaning a mixer, fuel and returning the excess bags, if possible.
Dick