New member here looking for some insight on my first basement reno.
The house we moved into is brand new and the frost/perimeter walls of the basement are properly studded, insulated and poly'd. The builder even sealed the bottom with acoustical sealant and properly tuck taped.
My issue is now that I want to run my electrical and some plumbing I'm not sure hot to best remove the poly? I don't want to make more work than I have to, so I was thinking of just cutting the poly horizontally at the middle and folding the bottom portion down, run my electrical/plumbing, then pull it back up and tuck tape the seam.
Does this sound reasonable?
Pics of what it looks like right now. I just finished installing the subfloor last weekend.
The house we moved into is brand new and the frost/perimeter walls of the basement are properly studded, insulated and poly'd. The builder even sealed the bottom with acoustical sealant and properly tuck taped.
My issue is now that I want to run my electrical and some plumbing I'm not sure hot to best remove the poly? I don't want to make more work than I have to, so I was thinking of just cutting the poly horizontally at the middle and folding the bottom portion down, run my electrical/plumbing, then pull it back up and tuck tape the seam.
Does this sound reasonable?
Pics of what it looks like right now. I just finished installing the subfloor last weekend.

