There is a recessed area (approx 3" deep) in the concrete slab in our bath that I need to build up before I install an acrylic shower base. I plan to use Quickcrete mortar to build up this area, then level off to match the height of the surrounding slab floor. The total area that I am building up only measures 3'x3'.
The shower base manufacturer also recommends setting the base into a 3/4" to 1" bed of sand topping mix to provide extra stability. So my questions are this:
1. How long do I need to leave the Quickrete mortar mix dry before I can overlay with the sand topping mix? One day? More?
2. Quikcrete states that the sand topping mix cures in as little as 30 minutes. Does tis mean that if I wait an hour or so, then I can stand on the acrylic shower base without any issues?
Just want to make sure I do this project the right way from the beginning. Tks for anyone's input.
The shower base manufacturer also recommends setting the base into a 3/4" to 1" bed of sand topping mix to provide extra stability. So my questions are this:
1. How long do I need to leave the Quickrete mortar mix dry before I can overlay with the sand topping mix? One day? More?
2. Quikcrete states that the sand topping mix cures in as little as 30 minutes. Does tis mean that if I wait an hour or so, then I can stand on the acrylic shower base without any issues?
Just want to make sure I do this project the right way from the beginning. Tks for anyone's input.