I had a contractor out that i used in past for a repair estimate. I was told there would be a estimate/diagnostic fee that is refunded if the work is performed. I was also told that contractor would be able to perform the work during the same visit if i agreed to their quote.
Seeing that i used them in past and the fact i was told the work would be done that day i agreed to have them out for the estimate. To insure there would be no issues with having the right material at hand i denoted on the phone what i need and was assured that everything needed for the repair was stocked on the truck.
Upon receiving the estimate i realized the price quoted was way out of line. I was also told they would have to return to do the repair in a few days since the didnt have what i needed with them.
I needed the service done that day and so in addition to the inflated quote I refused their service, relunctly paid the diagnostic fee and signed their invoice. You see where this is headed i bet...
Since my expectation of having the work completed that day did not happen, do you think i should have to pay this estimate fee?
Seeing that i used them in past and the fact i was told the work would be done that day i agreed to have them out for the estimate. To insure there would be no issues with having the right material at hand i denoted on the phone what i need and was assured that everything needed for the repair was stocked on the truck.
Upon receiving the estimate i realized the price quoted was way out of line. I was also told they would have to return to do the repair in a few days since the didnt have what i needed with them.
I needed the service done that day and so in addition to the inflated quote I refused their service, relunctly paid the diagnostic fee and signed their invoice. You see where this is headed i bet...
Since my expectation of having the work completed that day did not happen, do you think i should have to pay this estimate fee?