I posted before about an outdoor electrical run i am about to do here in Southern CA. Appreciate your help. This is going to be inspected. Here is what i have so far.
1. schedule 40 underground with THHN wiring (Hot, Neut & Grnd) to go to 5 receptacles and 2 connection boxes. Connection boxes are for possible future run.
2. I want to come out of the ground and go from schedule 40 to emt then to a receptacle box/connection box.
QUESTIONS:
A) What type connectors would you use between schedule 40 and emt?
B) What type of receptacle/connection box would you use? I was thinking of using the non-metallic type.
C) What size connection box? Connection box will have THHN 10 going into it. 9 Total wires in the box. 3 wires coming in, 3 going out and 3 more in the future coming out.
Thanks for any and all comments/suggestions.
1. schedule 40 underground with THHN wiring (Hot, Neut & Grnd) to go to 5 receptacles and 2 connection boxes. Connection boxes are for possible future run.
2. I want to come out of the ground and go from schedule 40 to emt then to a receptacle box/connection box.
QUESTIONS:
A) What type connectors would you use between schedule 40 and emt?
B) What type of receptacle/connection box would you use? I was thinking of using the non-metallic type.
C) What size connection box? Connection box will have THHN 10 going into it. 9 Total wires in the box. 3 wires coming in, 3 going out and 3 more in the future coming out.
Thanks for any and all comments/suggestions.