I am using 2X8 20' beams for my roof joists. They are supported underneath on both ends by a LVL beam. I need additional overhang on each side so I want to add another 2X8 to each. There will be no support underneath these so I want to make sure I connect them to the existing 2x8 (supported underneath) properly. Should I use 3" nails (3 vertically) every 18" or so or is there a better way?
Thanks
Thanks