Joined
·
1 Posts
I,m having a new driveway installed. The old was completely removed and the new is going in in sections. There was cement left over from the first pour and it was put in the second section to a depth of about 2inches. My contractor says it's OK to just pour the other 2 inches of the second section on top of the 2 inches already there. Is that OK do do?