DIY Home Improvement Forum banner

Composite fascia and code

2839 Views 2 Replies 3 Participants Last post by  joecaption
Building a new deck and had planned to wrap all the exposed PT with composite fascia. Most of the pictures I see online of decks with guard posts mounted inside the rim joists show a nice smooth wrap job. Where I am code requires bolts and washers (and tension ties) on the guard posts. I don't find many comments regarding fascia installation and few call out the fact that bolt heads will be in the way of a clean install job. This usually means I'm missing something obvious!

These DTT2Z guard post tension ties are not uncommon so practically everybody who is installing fascia must be dealing with the bolt heads somehow. I would have thought the manufacturers had a solution for this but they just said to countersink the bolts, which I read is not advised due to weakening the connection. Shimming is the obvious solution, but if so why aren't the shims provided with the fascia?

Thanks,
Scott
1 - 1 of 3 Posts
1 - 1 of 3 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top