I'm putting in this cobblestone walkway out of 1 7/8'' pavers over the top of my walkway in-between my two side walls.
The problem lies when I get to the edge of the driveway there is a 2'' drop off from the pavers to the walkway.
Can anyone shed some light on what they think is the best possible scenario for this situation. Someone has suggested, taking a concrete mixed with river pebble and inclining that up. I'm still looking for something a little better.
Thanks