I’m in the process of re-configuring my small master bathroom 5’ x 8’ layout. I have a 1960's tri-level house and it has the old cast iron waste lines. I have two back to back bathrooms on the 2nd floor, with a back to back toilet and back to back sink, the shower is tied in with the sinks (see pic 1). I would like put a tub in the toilet location and move the toilet to where the sink is (see pic 2). There is a 10 inch soffit so I would not have to cut any floor joists downstairs.
I need some suggestings, for the most cost efficient ways to rough in the new layout (e.g. will the existing line layout work (red lines), with minor changes or do I need to replace the entire backend). I’m already spending a lot of the budget in moving walls. I will greatly appreciate any help.
Thanks
I need some suggestings, for the most cost efficient ways to rough in the new layout (e.g. will the existing line layout work (red lines), with minor changes or do I need to replace the entire backend). I’m already spending a lot of the budget in moving walls. I will greatly appreciate any help.
Thanks
Attachments
-
58.2 KB Views: 20,863
-
62.6 KB Views: 41,419