Joined
·
13 Posts
Here's my situation:
I have a wall i my kitchen that is entirely tile. The people who owned the house before me thought it would be a good idea to tile a whole wall in the kitchen and hang cabients on it. (maybe this is normal? but it seems odd to me) I am in the process of taking down the cabients and moving the fridge and stove. I'm going to then rip all the tile off the wall. I did take a few tiles off the wall to see how well they were on there. And its pulling chunks of plaster off with it, which i expected. I want to know if once i get all the tile off, can i just dry wall over the old wall? or should i take it down to the studs? I was going to use 1/2" at the most if i go this route.
I have a wall i my kitchen that is entirely tile. The people who owned the house before me thought it would be a good idea to tile a whole wall in the kitchen and hang cabients on it. (maybe this is normal? but it seems odd to me) I am in the process of taking down the cabients and moving the fridge and stove. I'm going to then rip all the tile off the wall. I did take a few tiles off the wall to see how well they were on there. And its pulling chunks of plaster off with it, which i expected. I want to know if once i get all the tile off, can i just dry wall over the old wall? or should i take it down to the studs? I was going to use 1/2" at the most if i go this route.